Product · Decisions
Sign off a range in one pass.
Marona puts each product's requirements and evidence beside the decision. Every approval is bound to exactly what was shown, and reopens if any of it changes.
Waiting for Elin Moberg6 decisions
- Tarlo TL-200GB Computed, not approved
- Tarlo TL-200EEA Computed, not approved
- Orvel OV-16EEA Computed, not approved
- 3 more
Example
Fig. 1 · Friday's decisionThe basis, on one screen.
The approver sees what applies, the reports that cover it and the page each fact comes from.
- TR-011Radio · MB-3 · p. 3 · Tessel Test Lab Linked
- TR-042EMC and electrical safety · DRV-15 · p. 9 · Tessel Test Lab Linked
- TR-031Battery safety · BT-2 · p. 4 · Tessel Test Lab Accepted under SA-3 · Elin Moberg · 5 Oct 2026
-
ABefore approval200%
Green only when your approver accepts it, directly or under a standing approval.
-
BSource200%
Each report names its page and the part it covers.
-
CScope200%
The approval binds to exactly this basis.
Set routine approvals once.
Your approver writes the conditions once, for the products and the period they choose. Each match is then recorded as its own decision, with its report.
Accept battery-safety evidence for Ulvane Power's BT-2 battery in the Tarlo TL-200 (revisions B and C) and the Orvel OV-16, in the EEA, GB and CH, when the issuing lab has confirmed the report and its model list includes the product.
Set by Elin Moberg, 14 Sep 2026 · until 14 Mar 2027
Applied in October3 decisions
- Tarlo TL-200 · revision B TR-031 · p. 4 · issuer confirmed 5 Oct Accepted under SA-3 · Elin Moberg · 5 Oct 2026
- Tarlo TL-200 · revision C TR-031 · p. 4 · issuer confirmed 5 Oct Accepted under SA-3 · Elin Moberg · 5 Oct 2026
- Orvel OV-16 TR-047 · p. 3 · issuer confirmed 5 Oct Accepted under SA-3 · Elin Moberg · 5 Oct 2026
- Scope Two products, three markets
- Exceptions Unknowns go back to Elin
- Undo Anyone on your team can undo a match; their call wins.
Agents chase suppliers within your limits.
-
Supplier reminders
Agents send them from an approved template, filling only the marked fields from your own records. Anything else comes back to you.
Set by Elin Moberg · 2 Oct 2026
Please send list of items for model by date. Reference: your reference.
- Existing suppliers only
- Until 2 Apr 2027
- At most twice a week each
-
Bound to what was shown
An approval covers the message as shown, with its recipients and attachments, and is checked again at send time.
Edited after approvalNeeds approval again -
Template or exact message
The record shows which way each message went out.
- Kestrel Components · 30 SepExact message, approved by Elin Moberg
- Ulvane Power · 7 OctTemplate: Supplier reminder
-
Who approves
Someone on your team, or a consultant you name under a written mandate. Where the law requires a specific assessor or signatory, such as a notified body, Marona shows it; your approver's decision doesn't replace that role.
Notified bodyShown, not replaced
When a part changes, decisions reopen.
Each decision records who approved it, when and on what, so a change reopens only the decisions that relied on it. The record exports in full.
-
Tuesday
6 OctElin approves the Tarlo TL-200 for GB, on TR-041 for its driver, TR-031 for its battery and TR-011 for its radio.
Approved by Elin Moberg · 6 Oct 2026Relies on TR-011 · TR-041 · TR-031
-
Thursday
8 OctKestrel Components changes the voice coil in DRV-15. Six decisions are suspended. The Pilva Buds PV-1 doesn't use DRV-15 and keeps its approval.
SuspendedRelied on DRV-15 before the voice-coil change, and on TR-041.
Approved by Elin Moberg, 6 Oct 2026, for the earlier configuration
-
Friday
9 OctTR-042 covers the new DRV-15. Elin approves all six in one pass, under manifest MF-0412.
- Approved by Elin Moberg · 9 Oct 2026 6 decisions · TR-042, p. 9
Export the record
Know what every product needs.
Leave your work email and we'll invite your team.
Thank you. We'll write to when there's a place for your team. Add details